House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.
** progress pics in the replies.



TIL shelf foundation. I’ve not seen these here in California, since we don’t tend to have basement spaces in general.
But wow, you’ve moved literal tons of earth as a home improvement project. As the other comments remarked, this must have been quite the workout.
After World War II a lot of the soldier came back looking for work and many of them dug out the crawl spaces in our area plus added the shelf foundation. This is according to my father in law. I trust him but I haven’t looked into it further to confirm.
I made a 400sqft patio by moving 2 tons of pea gravel and 4000lbs of patio tile one tile at a time. In July heat.
What gets you is the tendonitis. But fuck decks, patios rule.
How many trips is 2 tons of pea gravel one at a time?
Many wheelbarrows.