House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.

** progress pics in the replies.

  • combomeal@lemmy.zipOP
    link
    fedilink
    arrow-up
    3
    ·
    edit-2
    2 days ago

    I had a family memeber that wanted me to do something similar. I ended up just getting started with the bucket thing and got into a groove. There are definitely smarter ways to do this.